The works included the works of the MEP CONSTRUCTION of Tower C and included the following works:
The central air conditioning and ventilation works are complete with stocks of galvanized saj or black and the installation of handling units and Van Coyle is complete with the work of air exits of various kinds as well as the installation of ventilation fans and clouds of smoke with different capabilities as well as insulation works.
Firefighting works starting from the main bulb rooms, stalks, machine gun installation and fire cabins.
The work of the CHILLED WATER PIPES is from the shiller and the work of the pumps to the internal units of the building with testing work, flushing, chemical disinfection and operation work.
C Tower consists of 30 floors with 8 different models for the same floor as well as service rooms on each floor which number up to 5 service rooms for different systems.

Alamein Towers Project
Alamein Towers Project
Alamein Towers Project
Alamein Towers Project
Owner: Ministry of Housing, Utilities and Urban Development
Under the supervision of HASSAN ALLAM CONSTRUCTION
CONSOLIDATED CONTRACTORS COMPANY (CCC)
Consultation: ECG Group of Consulting Engineers