MZ | General Contracting

Sanitation - Nob Villag- Sablawin - Daqahlia

The project included sewage works from the implementation of matching works and branches that included the implementation of pipes from UPVC in different countries
as well as probation work for pipes that are one metre below the finishing surface
Industrial beach works include laying pipes of HDPE to feed injection sprayers that inject chemicals on the shore from under the lake and included excavation and dissolution works and special installation works for pipes to reach the desired design. The lengths included approximately 10,000 pipes with fittings and assemblies with different diameters from machine rooms to the required feeding points.
In addition to the use of the Sindh Retaining Wall, due to the difficult and recognizable nature of clay soil in these villages.

Nob Village
Nob Village